This document contains the agreed version of the ISEAL Code v1.0. Following recommendation for by the ISEAL Technical Committee, this was approved by the ISEAL Board on 29 November 2023. When reviewed alongside the summary of feedback received during the consultation period, it demonstrates the result of how input during the consultation was taken into account. The ISEAL Code was effective from 1 March 2024, with an 18-month transition period for ISEAL Code Compliant organisations to meet the requirements in the ISEAL Code. For more information, read about the compliance approach and transition period.
The ISEAL Code v1.0 is available in PDF and Excel format below. Read more about the ISEAL Code here.
Please note, in September 2025, the ISEAL Code v1.1 was published with immediate effect.